USACE Alaska District awarded Bristol the first task order under the International and Interagency Support Indefinite Delivery type contract. This $6 million project included facility renovations and an addition to modernize the Chena Flood Control Project office, located in North Pole, Alaska. The office improvements provided a structure that met current and future operational needs, in addition to being energy efficient and environmentally friendly. 

New construction included a 2,600-square-foot addition to the east side of the existing office as well as a 950-square-foot emergency response bay. The new areas feature a cast-in-place concrete foundation and in-slab heating, structural timber frame, insulated and non-insulated walls and partition framing, membrane and metal roofing, composite exterior siding, wood clad aluminum framed windows, glazed storefront, a masonry heater and durable commercial-grade interior finishes and fixtures. Utilities were upgraded and a septic sewer system and photovoltaic system were installed.

The site incorporated a lighted paved parking area, site drainage, landscaping and seeding, underground electrical service, and sidewalks. During site excavation, approximately 127 cubic yards of contaminated soils was encountered, sampled, stockpiled, and removed.

Client: USACE

Location: Alaska

service line: Vertical Construction
contract amount: $6,000,000
Award Date: November 2009
completed date: June 2011
SB

Highlights

  • Government project office
  • Addition and renovation project
  • Energy efficient and environmentally friendly
  • Contaminated soil was encountered, sampled, stockpiled, and removed

Highlights

  • Government project office
  • Addition and renovation project
  • Energy efficient and environmentally friendly
  • Contaminated soil was encountered, sampled, stockpiled, and removed